Who is Responsible for the Impacts of a Differing Site Condition on a Design-Bid-Build Project Versus a Design-Build Project?
Join Peckar & Abramson, P.C. and Langan Engineering & Environmental Services, Inc. for a discussion of Owner, Designer and Contractor risks associated with differing site conditions on design-build and design-bid-build projects.
Join here: https://bit.ly/3NOQA7F